The foundation is done, the framing starts Tues, contractor expects to be completed in two more weeks weather permitting!!!
Started trying to get this built 11 months ago!
Third contractor was the charm. They are doing a great job above and beyond what is required by code, easy to work with, no hassles about doing things that I wanted, even suggested ways to save costs and get more for my money.
SPECS: 28x28', 1-3/4 story, 11' clear ceiling to bottom of 2nd floor joists for lift clearance. 18'x8' oversize insulated door, Anderson thermopane vinyl clad awning and casement windows thruout, separate 200A 220V electrical service. They would have been done before Xmas, but my entire lot first needed to be regraded, took out 12 loads of fill, then we were thrown a curve by Durham inspections twice, once that required resiting the garage due to their interperatation of the setback rules different than what was written and we had been told when doing the planning, and then requiring an independent survey to make sure we were within the new setbacks before the foundation walls could be erected.
We will soon have a warm (and cool) dry level inside place to finish our tow vehicle, a place to park an enclosed trailer, and the workshop I've wanted since I moved here.